Scope of work:
installation and integration of LTE800 and LTE2600 systems based on Nokia equipment, installation of: single RRHs, jumper cables and AISG cables, DC power cables and fibre optics; installation of the FSMF system with the FBBC card and FPFC power modules in the shelter, as-built tests.