SCOPE OF WORK
reconstruction of the existing U2100 and LTE800 systems, installation of LTE1800. Replacement of the power supply system with Huawei SSC DC2, disassembly of Nokia UltraSite, replacement of DTMA, installation of U2100/L1800 combiners, modernization of existing feeders, installation of Nokia FSME and FSMF system modules, installation of Nokia FRGX, FRMA and FXEF radio modules, installation of a safe, antenna track measurements, integration, documentation, as-built tests (calltests).